River Purification and Aquaculture Project in Malaysia
Project overview April 2015 / Two 150L/min OK Nozzles Two 150L/min OK Nozzles were installed as a part of a ri[…..]
Project overview April 2015 / Two 150L/min OK Nozzles Two 150L/min OK Nozzles were installed as a part of a ri[…..]
System setup Test period: November 2015 Two 300L/min OK Nozzle units installed. The system was operated for fi[…..]
1. Experiment purpose Before purifying the water of Yodo-castle moat directly on the spot, we conducted a puri[…..]
With fine bubbles Without fine bubbles Fine Bubble Generation inside the Painting Booth Tank